Step 1
On-site survey

              When it comes to indoor temporary enclosures, we offer a new interior construction service that replaces the conventional and LGS methods.
              We support various fields such as tenant replacement in commercial facilities, offices, and interior partitions in hospitals.
            
Step 1

On-site survey
Step 1
On-site survey

 
               
              Step 2

Quote creation
Step 2
Quote creation

 
               
              Step 3

Arrangement of workers
Step 3
Arrangement of workers

 
               
              Step 4

Assembly
Step 4
Assembly

 
               
              Step 5

Dismantling
Step 5
Dismantling

 
            An introduction to our products used for construction
                    Our indoor temporary enclosure construction service uses our telescopic quick-construction “Papatto E3 panels.” The Papatto E3 panels are designed to integrate the faceplate with the frame, and two panels are stacked to form a unit.
                    It expands and contracts to a height of 1,850 mm to 3,300 mm, allowing it to attach to the ceiling and stand on its own without the use of screws, etc.
                  
 
                It is used as temporary enclosures to screen and protect worksites as well as for construction for new tenants in a variety of scenes such as commercial facilities, condominiums, schools, train stations, hospitals, airports, offices, and factories.













It reduces the generation of dust that used to be seen as inevitable
                  There is absolutely no need to cut the panels, because they expand and contract to match the height of the ceiling. It’s useful in work environments where there is a desire to control dust generation.
                  *When constructed with standard runners
                

It can be easily reinstalled
The Papatto E3 panels can be used over and over again by changing the installation location and floor, overturning the conventional wisdom of the mall barricade industry, where disposable items were the norm. Reusing the panels reduces the discharge of industrial waste.

Achieves a beautiful harmony between the construction site and the surrounding environment
With its clean, white base color, it fits well in any field. There are no screw holes on its surface, making it aesthetically pleasing as well.
 
              [NETIS registration no.] KK-190029-A
It has been registered as a new technology in the NETIS (New Technology Information System in public works) database from the Ministry of Land, Infrastructure, Transport and Tourism.
 
              Comments from the Good Design Award Jury:
This construction method is superior to conventional methods in that they’ve taken a construction site temporary enclosure that conventionally used disposable materials and made it reusable as well as in how they’ve made installation easy, eliminating the need for protection. After installation, the exterior has a simple and flat appearance, with steel plates on the panel surface, giving it a solid impression that does not feel like temporary construction. Its ability to expand and contract makes installation simple, and this is also expected to lead to improvements in the labor shortage on construction sites.